Tramway line


Type : Infrastructure
Object : Tramway line
Location : Latvia/Daugavpils
Started : 2015
Finished :

The project Accommodation of separate sections of the overhead wiring of the existing tramway routes in the city of Daugavpils to the usage of trolley pole and pantograph current collectors provides for the accommodation of the existing tram routes, so that the overhead wiring would be capable of handling the traffic of trams with both trolley pole current collectors and pantograph current collectors within the sections accommodated within the boundaries of the project. The project is divided into two stages: Stage A consists of the following substages: from the crossroads of 18. Novembra Street and Valkas Street to the crossroads of 18. Novembra Street and Vasarnicu Street inclusive; from the crossroads of 18. Novembra Street and Valkas Street to the entrance into the territory of the tramway depot on Jatnieku Street; within the territory of the tramway depot at 90 Jatnieku Street; from the crossroads of 18. Novembra Street and Valkas Street to the crossroads of 18. Novembra Street and Ventspils Street; from the crossroads of 18. Novembra Street and Ventspils Street to the building at 1 Vienibas Street. Stage B includes the performance of works within the section from the crossroads of 18. Novembra Street and Ventspils Street to the turning circle on Visku Street. The entire scope of modernization works has been carried out pursuant to the contracting authority’s design assignment within both stages, including the replacement of overhead wiring supports in accordance with the regulatory requirements.