DRAINAGE PIER
Par
The project provided for the construction of a new flyover and drain platforms, along with the reconstruction of rail tracks. Drain platforms are situated on the rail tracks, whereas the flyover is located between these tracks. The construction process is divided into 2 stages. The first stage featured the construction of 40 m long fuel drain platforms and the respective section of the flyover. Stage two involved the construction of another 44 m of platforms, connecting to those built during the first stage.
Tips
Pilna cikla projektēšana
Atrašanās vieta
Latvija
Apgabals
gads
2015